☰ Menu
×
Home
Operator Training
Operator Training
Drinking Water Courses
Wastewater Courses
Management Courses
Online Courses
Math Courses
Water Treatment Specialist
Wastewater Treatment Specialist
Glossary
Corrections
Links
Research
Research
Featured Items
Stormwater
Wastewater
Soils & Groundwater
Software Tools
Paper, Reports & Presentations
Staff
Water Seminars
University Connection
University Connection
OWP Fellowship
Student Assistants
Teaching
Media Library
About Us
About Us
Contact Us
Careers
FAQ
Research
Featured Items
Stormwater
Wastewater
Soils & Groundwater
Software Tools
Papers, Reports & Presentations
Staff
Stormwater
☰
Research
Featured Items
Stormwater
Wastewater
Soils & Groundwater
Software Tools
Papers, Reports & Presentations
Staff
Stormwater Services
NPDES program management assistance
BMP and runoff assessments
Source control evaluations
LID design and implementation
Stormwater funding and financing
Regional planning
Training
LID design and implementation
Implementation of City of Sacramento LID Standards at Sacramento State
The City of Sacramento contracted with OWP in 2014 to manage and implement a grant from the CA State Water Resources Control Board. The project consisted of designing, installing, and monitoring stormwater low impact development (LID) best management practices (BMPs) on the campus of Sacramento State, as well as conducting an extensive education and outreach program that includes workshops, webinars, walking tours, and a regional LID conference. The City was the prime awardee because of a grant condition, but opted to contract with OWP to serve as the technical liaison between the City and university. OWP staff collaborated with multiple university entities to facilitate planning, design, and construction of multiple LID BMPs on campus, including bioretention planters, rain gardens, down spout disconnects, an infiltrating bioswale and porous pavement. OWP staff also performed BMP sizing using the Sacramento Hydrologic Model, conducted field monitoring, evaluated and documented performance results, and executed all outreach activities.
Links:
https://www.owp.csus.edu/csus-lid/
https://www.owp.csus.edu/lid/
Contact:
Maureen Kerner
CA Phase II LID Sizing Tool
In 2013, OWP was awarded a Proposition 84 grant from the State Water Board’s Stormwater Grant Program: The CA Phase II Low Impact Development (LID) Sizing Tool. The LID Sizing Tool is a web-based program that assists stormwater practitioners in selecting and sizing LID best management practices that meet the sizing requirements in California’s National Pollutant Discharge Elimination System permit for stormwater discharges from small municipal separate storm sewer systems.
Links:
CA Phase II LID Sizing Tool
Contact:
Maureen Kerner
Sacramento LID Manual Update
OWP, working with the Sacramento Stormwater Quality Partnership, developed a point-based low impact development (LID) credit system to allow both developer and municipal plan reviewer to easily evaluate proposed best management practices (BMPs) to determine whether the LID requirements have been met.
Contact:
Brian Currier
Operator
Stormwater
Research